Work generally consists of all labor, materials, tools, equipment and services required for construction of approximately 8,300 LF of 24”, 11,350 LF of 20”, 11,850 LF of 18”, 6,250 LF of 12” and 1,150 LF of 8” loop conduit piping; 75 LF of steel casing pipe installation by Bore & Jack; 630 LF of directionally drilled 24” loop conduit pipe; 78,000 LF of 2” conduit; 13 precast concrete vaults; various water valves, fittings, blowoffs and appurtenances; traffic control, alignment grubbing and mulching, pavement restoration and other work as necessary to complete the project.
Department:
Environmental Services
Closing Date:
Thursday, March 14, 2024 - 2:00pm
Status:
Open