The project generally consists of all labor, materials, equipment and services required for disconnecting and removing a existing gas fired, packaged rooftop unit (RTU) at South Coastal Library, which primarily serves the Children’s Collection and Program Room and installing a new gas fired, packaged rooftop unit. The project also includes the installation of an economizer hood on another existing Carrier rooftop unit at the same location.
Department:
Engineering
Closing Date:
Friday, May 12, 2023 - 11:00am
Status:
Open