The Project consists of furnishing and installing approximately 750 linear feet of eight-inch (8”) and ten-inch (10”) PVC gravity sewer main; 60 vertical feet of four-foot (4’) diameter sanitary sewer manhole; 30 vertical feet of five-foot (5’) diameter sanitary sewer manhole; seven (7) manhole frames and covers; a pump station with duplex submersible pumps with approximately 1,165 linear feet of four-inch (4”) HDPE SDR 11 force main; pipe testing, and trench and roadway restoration.
Department:
Engineering
Closing Date:
Wednesday, September 17, 2025 - 10:00am
Status:
Open