Engineering

Warwick Sewer Project Phase 1

The Project consists of furnishing and installing approximately 750 linear feet of eight-inch (8”) and ten-inch (10”) PVC gravity sewer main; 60 vertical feet of four-foot (4’) diameter sanitary sewer manhole; 30 vertical feet of five-foot (5’) diameter sanitary sewer manhole; seven (7) manhole frames and covers; a pump station with duplex submersible pumps with approximately 1,165 linear feet of four-inch (4”) HDPE SDR 11 force main; pipe testing, and trench and roadway restoration.

Residential Home Elevation

Bids are being sought from Contractors to provide all labor, materials and equipment required to construct raise a residential home above Base Flood Elevation. The following work is included:

  1. New foundation system
  2. New support posts and CMU wall extension/in-fill
  3. Raised flooring system
  4. Relocated/new windows and doors
  5. General home construction/modifications
  6. Roof system
  7. Mechanical, electrical & plumbing modifications
  8. Site restoration

Sugar Maple Farms Road Improvements

Bids are being sought from Contractors to provide all labor, materials and equipment required to performing pavement repairs and improvements to the street network within the Sugar Maple Farms community in accordance with the specifications and details provided herein; including but not limited to pavement preparation, pavement milling and patching, pavement overlay, driveway adjustments, edge grading/stabilization, maintenance of traffic, and site restoration as required to complete all work specified.

Countryside Hamlet Sanitary Sewer Project

The Project consists of furnishing all labor, material, and equipment for the installation of approximately 1,900 LF of 8-inch gravity sanitary sewer and associated manholes, 650 LF of 6-inch sewer laterals and associated cleanouts, 40 LF of 16-inch jack-and-bore, new pump station and associated site work, 2,430 LF of 3-inch forcemain, and all other ancillary items as shown on the construction plans.

Pages