Standard Details

Sewer Standard Details

Sewer Standard Details – Full Set (5.04 MB PDF)

Section 1 – Manhole Structures

Detail Name Issue Date
PDF file type symbolS-1.01 - Precast Concrete Manhole 12/30/2021
PDF file type symbolS-1.02 - Manhole Frame and Cover 05/31/2022
PDF file type symbolS-1.03 - Manhole Frame and Cover Adjustment 12/30/2021
PDF file type symbolS-1.04 - Inside Drop Manhole 12/30/2021
PDF file type symbolS-1.05 - 48 in. Diameter Shallow Precast Manhole 12/30/2021
PDF file type symbolS-1.06 - Doghouse Manhole 12/30/2021
PDF file type symbolS-1.07 - Force Main Discharge Manhole 12/30/2021
PDF file type symbolS-1.08 - Low Pressure Force Main Discharge 12/30/2021
PDF file type symbolS-1.09 - Manhole Step 12/30/2021
PDF file type symbolS-1.10 - Manhole Flow Channel 12/30/2021
PDF file type symbolS-1.11 - Manhole Abandonment 12/30/2021
PDF file type symbolS-1.12 - Pipe Abandonment at Manhole 12/30/2021
PDF file type symbolS-1.13 - Hot-Mix Ramping at Manhole 12/30/2021

Section 2 – Laterals and Cleanouts

Detail Name Issue Date
PDF file type symbolS-2.01 - Sewer Lateral Cleanout 10/11/2023
PDF file type symbolS-2.02 - 6 in. Sewer Cleanout Frame and Cover 05/31/2022
PDF file type symbolS-2.03 - 8 in. Sewer Cleanout Frame and Cover 05/31/2022
PDF file type symbolS-2.04 - Deep Sewer Lateral Cleanout 12/30/2021
PDF file type symbolS-2.05 - Sewer Lateral Connections 10/05/2022
PDF file type symbolS-2.06 - Sewer Lateral Riser 10/05/2022
PDF file type symbolS-2.07 - Sewer Terminal Cleanout 12/30/2021
PDF file type symbolS-2.08 - Dual Wye Sewer Cleanout 12/30/2021
PDF file type symbolS-2.09 - Tee Inspection Port for Future Sewer Extensions 12/30/2021
PDF file type symbolS-2.10 - Sewer Lateral Capping 12/30/2021
PDF file type symbolS-2.11 - Sewer Lateral Cleanout Relocation 10/11/2023

Section 3 – Pipe Trenching

Detail Name Issue Date
PDF file type symbolS-3.01 - Sewer Trench 12/30/2021
PDF file type symbolS-3.02 - Sewer Encasement 12/30/2021
PDF file type symbolS-3.03 - Casing Sleeve Installation 12/30/2021
PDF file type symbolS-3.04 - Pipe Crossing Protection 06/13/2022

Section 4 – Force Mains

Detail Name Issue Date
PDF file type symbolS-4.01 - Sewer Force Main Air Release Valve 05/31/2022
PDF file type symbolS-4.02 - Air Release Valve Assembly 12/30/2021
PDF file type symbolS-4.03 - Concrete Buttress Configurations 12/30/2021
PDF file type symbolS-4.04 - Concrete Buttress Dimensions 12/30/2021
PDF file type symbolS-4.05 - Sewer Force Main Plug Valve 12/30/2021
PDF file type symbolS-4.06 - Sewer Force Main Isolation Valve 12/30/2021
PDF file type symbolS-4.07 - Sewer Force Main Toning Wire Box 12/30/2021
PDF file type symbolS-4.08 - Transition from HDPE to Non-HDPE Pipe 12/30/2021

Section 5 – Low Pressure Sewer

Detail Name Issue Date
PDF file type symbolS-5.01 - Standard Grinder Pump Assembly 06/26/2023
PDF file type symbolS-5.02 - Standard Grinder Pump Assembly (Floodplain Areas) 06/26/2023
PDF file type symbolS-5.03 - Lateral Assembly Isolation Valve 01/18/2023
PDF file type symbolS-5.04 - LPS Discharge Connection 09/09/2022
PDF file type symbolS-5.05 - Terminal Flushing Connection 09/09/2022
PDF file type symbolS-5.06 - In-Line Flushing Connection 09/09/2022
PDF file type symbolS-5.07 - Control Panel Post Mounting 06/26/2023

Electrical Standard Details

Electrical Standard Details – Full Set (0.9 MB PDF)

Detail Name Issue Date
PDF file type symbolE-1 - Antenna Pole 12/30/2021
PDF file type symbolE-2 - Site Light 12/30/2021
PDF file type symbolE-3 - Typical Grounding Plan 12/30/2021
PDF file type symbolE-4 - Ground Rod Types 12/30/2021
PDF file type symbolE-5 - Underground Conduit Installation 12/30/2021
PDF file type symbolE-6 - Electrical Terminators and Conduits and Bases 12/30/2021
PDF file type symbolE-7 - Tier 1 Pump Station Typical Electrical Cabinet Control Side 12/30/2021
PDF file type symbolE-8 - Tier 1 Pump Station Typical Electrical Cabinet Power Side 12/30/2021
PDF file type symbolE-9 - Tier 2 Pump Station Typical Electrical Cabinet Control Side 12/30/2021
PDF file type symbolE-10 - Tier 2 Pump Station Typical Electrical Cabinet Power Side 12/30/2021

Pump Station Standard Details (Future)

Instrumentation Standard Details

Instrumentation Standard Details – Full Set (3.26 MB PDF)

Detail Name Issue Date
PDF file type symbolI-1 Cabinet Heater and Supply Fan 4/25/2023
PDF file type symbolI-2 Voltage Monitor Relay Elementary Single Phase 4/25/2023
PDF file type symbolI-3 Voltage Monitor Relay Elementary Three Phase 4/25/2023
PDF file type symbolI-4 Wet Well Level Sensor 4/25/2023
PDF file type symbolI-5 Power and Control Cabinet Arrangement Single Phase Service 4/25/2023
PDF file type symbolI-6 Power and Control Equipment Arrangement Single Phase Service 4/25/2023
PDF file type symbolI-7 Power Equipment Cabinet Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-8 Control Equipment Cabinet Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-9 Pump Control Panel Layout Single Phase Service 4/25/2023
PDF file type symbolI-10 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-11 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-12 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-13 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-14 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-15 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-16 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-17 Pump Control Panel Wiring Diagram Single Phase Service 4/25/2023
PDF file type symbolI-18 Power and Control Cabinet Arrangement Three Phase Service 4/25/2023
PDF file type symbolI-19 Power and Control Equipment Arrangement Three Phase Service 4/25/2023
PDF file type symbolI-20 Power Equipment Cabinet Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-21 Control Equipment Cabinet Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-22 Pump Control Panel Layout Three Phase Service 4/25/2023
PDF file type symbolI-23 Pump Control Panel Layout Three Phase Service 4/25/2023
PDF file type symbolI-24 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-25 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-26 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-27 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-28 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-29 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023
PDF file type symbolI-30 Pump Control Panel Wiring Diagram Three Phase Service 4/25/2023

Miscellaneous Standard Details

Miscellaneous Standard Details – Full Set (0.2 MB PDF)

For requirements related to the design and construction of private streets and related amenities, refer to Chapter 99 / Article III of Sussex County Code and/or the appropriate Federal and State requirements.

Detail Name Issue Date
PDF file type symbolM-1 - Concrete Sidewalk 06/30/2022
PDF file type symbolM-2 - Drainage Inlet Top Unit Type D-Modified 06/30/2022